An open-data service of Sable County · Office of Budget and Research

Sable IndicatorsSable County, by the numbers

Housing units permitted: methodology

Version
2.3
Last reviewed
Contact
housing-data@example.com

This page explains how the monthly count of housing units permitted is produced, what it includes and leaves out, when it is revised, and what changed in each revision.

What the indicator measures

Housing units permitted counts the new homes authorized for construction in Sable County each month. It is a leading indicator: most permitted units are completed 9 to 18 months later, and a small share are never built.

The figure covers the unincorporated county and the four cities that issue permits through the shared county system. The City of Laneport runs its own permit office and is reported separately until it joins the system in 2027.

Definitions

Housing unit
A house, apartment or other group of rooms intended as separate living quarters, with its own entrance and kitchen. Accessory dwelling units count as one unit each.
Building permit
A residential new-construction permit issued by the county or by one of the four cities that report to the county permit system (Ashford, Kell, Marlow and Port Sable).
Units permitted
The number of new housing units authorized on permits issued in the calendar month. A 24-unit apartment building counts as 24.
Structure type
Single-family (detached and attached), 2 to 4 units, and 5 or more units, following the categories used in the federal Building Permits Survey.
Issue date
The date the permit was issued, not the application or inspection date. Months are calendar months in local time.

Data source

Records come from the Sable County Department of Permitting’s permit system, extracted on the second business day after the month closes. Each record carries a permit number, issue date, parcel, valuation, structure type and number of units.

Permits for alterations, additions, demolitions, re-roofs and manufactured homes placed on existing pads are excluded. Permits voided within 30 days of issue are removed before publication.

Timing and the monthly freeze

The first estimate for a month is published in the first week of the following month, on the date shown in the release calendar, and marked preliminary. It is revised once, the following month, and then marked final. After that a month changes only through a documented revision or the annual reconciliation in February.

Figures are not seasonally adjusted. Permits in Sable County run about 20% higher from April to July than in winter months, so compare a month with the same month a year earlier rather than with the month before.

Revision policy

When a published figure changes, the previous value stays visible in the revision log below with the date and reason. We do not overwrite a month silently. Revisions of fewer than five units to a final month are held for the annual reconciliation.

Revision log

Revisions to published figures, most recent first
DatePeriodWasNowReason
September 2026366384Port Sable reported 18 late-issued units in a 5+ unit building.
August 2026362362Reviewed, no change. Two voided permits offset by two late reports.
April 2026396402Six ADU permits recoded from alteration to new construction.
2025 annual4,3344,345Annual reconciliation with the federal Building Permits Survey.

Limitations

A permit is an authorization, not a start or a completion. Large multifamily projects can make a single month jump; check the structure-type breakdown before reading a trend into one month. Unit counts are self-reported on the permit application and checked against plans only for buildings of 5 or more units.

Questions

Why does the latest month say “preliminary”?

Cities can report permits up to 30 days after issue. The first estimate usually rises by 1 to 3% when it is revised the following month.

Why doesn’t this match the federal Building Permits Survey?

The federal survey imputes for non-reporting places and uses a different reporting date. Our annual totals are reconciled to it each February; monthly figures can differ by up to 5%.

Can I get permit-level records?

Yes. Permit-level data, without owner names, is on the county open data portal and is updated nightly. This indicator is a monthly summary of that file.

How should I cite this indicator?

Sable County Office of Budget and Research, “Housing units permitted,” Sable Indicators, accessed (date). Include the month of the release you used.

Palette

Palettes · 60 / 30 / 10