The studio

Architecture, interiors, conservation and furniture, from a second-floor room in an 1887 tannery on the Ashby river.

Approach

We are a studio of twelve: four licensed architects, two interior designers, a furniture maker, two designers in training and a studio manager. Petra Lind and Kwame Oduya started the practice in 2014 and still lead every project.

Most of our work is within a three-hour drive of Ashby Falls, which means we can be on site every week during construction. We take on eight to ten projects a year, from a single room to buildings of around 25,000 square feet.

We build mainly in timber and use local stone, brick and labor where we can. Every new building since 2020 has been designed to the Passive House standard, and half of our work is the repair and reuse of buildings that already exist.

Founded in Ashby Falls
2014
People in the studio
12
Licensed architects
4
Completed projects
46

People

Kwame Oduya Founding partner, architect
Petra Lind Founding partner, interior architect
Everyone in the studio
NameRoleEmail
Kwame Oduya Founding partner, architect k.oduya@example.com
Petra Lind Founding partner, interior architect p.lind@example.com
Sana Whitlock Associate, project architect s.whitlock@example.com
Tomás Reyes-Hale Architect t.reyeshale@example.com
Ines Marrow Interior designer i.marrow@example.com
Daniel Achterberg Architectural designer d.achterberg@example.com
Mei Ostrander Studio manager m.ostrander@example.com
Rufus Bell Furniture and model making r.bell@example.com

How a project runs

Fees are a fixed sum for each stage, agreed before it starts. A typical new house takes 14 to 20 months from first visit to completion.

  1. 01

    Site visit and brief

    1–2 weeks

    We meet you on site, walk the ground or the building with you, and write a short brief together. The first visit is free within a three-hour drive.

  2. 02

    Feasibility

    3–6 weeks

    A measured survey, zoning and permit checks, two or three options in plan and section, and a first cost estimate from an independent cost consultant.

  3. 03

    Concept design

    6–10 weeks

    One option developed with models and drawings. You see it at 1:50 in card and timber in the studio before we go further.

  4. 04

    Developed design and permits

    2–4 months

    Structure, energy and services coordinated with the engineers, and the permit application made. We go to every review hearing with you.

  5. 05

    Technical design and tender

    2–3 months

    Construction drawings and specifications, a bid from two or three builders we know, and help choosing between them.

  6. 06

    Construction and aftercare

    Build, then 12 months

    Weekly site visits, payment certificates and the handover. We come back after a year to check how the building is working and fix what isn’t.

Clients

Careers

Send a CV and a portfolio under 10 MB to careers@example.com. We reply to everyone.

Contact

Oduya Lind Architects
The Tannery, Studio 3
41 Mill Race Lane
Ashby Falls, VT 05462
Hours
Monday to Friday, 9 a.m. to 6 p.m.
Map: the Tannery on Mill Race Lane, between the river and Main Street, two blocks from Ashby Falls station. The Tannery Station Main Street Mill Race Lane Ashby River
Parking in the Tannery yard off Mill Race Lane. Ashby Falls station is a six-minute walk.

Tell us about your project

Town and state is enough.

When would you like to start?

A few lines is plenty. Include a budget range if you have one.

We reply within five working days. Your details are only used to answer you.

Palette

Palettes · 60 / 30 / 10